PROJECTS

Experience:

  • Road Construction including bypasses and service road (GSB, WMM, DBM, BC) in the state of uttarakhand from km, 129+660 to 170+407 of the Nagina Kashipur project NH-74 under PNC Infratech Ltd.
  • Road Construction including bypasses and service road (GSB, WMM, DBM, BC) in the state of Uttar Pradesh from km, 71+614 to 129+660 of the Nagina Kashipur project NH-74 under PNC Infratech Ltd. (2021-2022)
  • Shifting of 300 mm dia MS ERW Rising Main pipe line from Medical College Almora.
  • Maintenance work of Ghaziabad Aligarh Expressway NH-86.
  • Various site, hotels and housing society development and construction works  in various places of Kumaon in last three decades.
  • Toll Plaza office complex traffic and medical post at Chakeri – Allahabad NH-2.
  • Construction of civil work like boundary wall, toe wall etc. in NH-74.
  • Tree cutting, logging, stacking, loading, and transportation at section -1 (Meerut- Behsuma) under PNC Infratech Ltd. (2022-2023)
  • Reconstruction work of  (DBM, SDBC) in Ramnagar under PWD Uttarakhand. (2022-2023)
  • Reconstruction work of  (DBM, SDBC) in Haldwani  km. 38 to 40 SH-05 ( SDBC ) under PWD Uttarakhand. (2022-2023)
  • Reconstruction work of  (DBM, SDBC) in Haldwani under PWD Uttarakhand. (2022-2023)
  • Devaichour to Anandpur chouki road remaining area of Anandpur Chouki to Vasundhara Banquet Halll by BC (Road work). (2022-2023)
  • Reconstruction work of  ( DBM/BC) in Haldwani. (2022-2023)
  • Reconstruction work of  (DBM ,SDBC) in Haldwani ( Road work) under PWD Uttarakhand. (2022-2023)
  • Construction of boundary wall Meerut-Nazibabad in NH-34

Ongoing Projects

  • Currently working on an 11-km pipeline project with powerhouse, pumping station and OHT with a capacity of 1500 KL at Almora Medical College, Uttarakhand. (2022-2023)
  • A-Renewal work SARDARNAGAR BERIADOLAT BANNAKHERA & MASIT BAREIIL NAGAR SAKENIYA ROAD.
  • Renewal work by 30 mm BC in the year 2023-24 Ranibagh-Bhimtal-Khutani-chafi-Padampuri-Dhanchuli-Motiapathar etc Km.3,4,6 to 12,37 to 49
  • Nainital-Kaladhungi-Bajpur Doraha motor road (sh-13) km 2 to 5 & km 10 to 16 (length 11 km )and Bhawali -nainital-tankikilbary-{pangoot motor road (sh-63) km 14 to 17 (length 3.2 km)
  • Under the deposit head, Canal covering and road Construction work from Chaufula intersection of Kaladhungi Constituency in Nainital District to Trimurti temple via Unchapul(Chaufula to Unchapul part- Road Construction work)
  • Strengthening of Dankanya (Danakanya) Water Supply Scheme in Ramgarh, Nainital
  • Construction of 250 KL capacity RCC OHT ( 16 m Staging) and consrtuction of boundary wall at seetaram baba gaudham area,haldikhal under Damuadhunga water supply scheme
  • Pipe Line work in Vidrampur-Rampur at Kotabagh block
  • Pipe line work Choti haldwani at Kotabagh block
  • Pipe line work in Daun,Pareva at Kotabagh block

All rights reserved www.nirvanainfratech.com